Resources

ICPR Modeling Tips (ep.6): Initial Stages

Written by Streamline | May 31, 2023 4:00:00 PM

 

Initial stages set the water surface elevation at the onset of a simulation, and setting these stages incorrectly can be one of the most common mistakes made in ICPR4.


In this modeling tip video, we walk through examples of the initial stages for three methodologies and even highlight a common initial stage mistake!

All Modeling Tip videos were recorded using ICPR4. The features and functionalities displayed throughout each video are also applicable within StormWise 4.08.00 and beyond.